Specifications include, but are not limited to: MOWING: All grassed and bedded areas must be mowed and trimmed at least once per week during growing season (the growing season is defined as March 1 – October 31) The Contractor is responsible for leaf and debris removal as needed for the entire contract. Mowing to be conducted more often if needed during growing season. Mowing shall be done in straight lines as much as possible. Mowing must be done in a manner that does not leave tire marks or damage turf around trees. Grass clippings will not be allowed to accumulate at any time. Clippings will be bagged/smoothed out or “windrows” and raked. One area of the lawn should be completed (including: edging, trimming and blowing sidewalks before moving to another area). A neat, well-groomed appearance must be maintained throughout of the year. All lawn grasses shall be cut and maintained at the appropriate height as directed by the SCC Grounds Supervisor. Generally, Fescue & Fescue blends shall be maintained no lower than 3.5 inches and no higher than 4.5 inches, Bermuda grass will be maintained between 2”-3”. (Exception: extended inclement weather periods). At no time will the contractor be allowed to remove more than 50% of the turf height unless directed or approved by the appropriate SCC staff. EDGING: Edge all sidewalks, drives, buildings, curbs, and around all objects or structures on a weekly basis. Dirt and clippings will be swept or blown from sidewalk immediately after completion of edging. PRUNING: All pruning will be completed as part of this contract and must be coordinated with the SCC Grounds Supervisor. Pruning shall be in a manner appropriate to the natural character and growth of each plant. All plants will be pruned as needed to keep clean appearance. All suckers or exceptional growth and all damaged or broken branches shall be removed. A well-manicured appearance must be maintained. Branches and clippings will be removed on the same day of pruning. All limbs and trees that fall from natural causes will be removed by the Contractor. Trees and limbs that are damaged and require removal because of storms or other acts-of-God will be the responsibility of the College. BEDS: Contract includes weeding and replenishing all mulch/pine straw beds (including beds at signs). Beds shall be raked and maintained to a fresh and maintained appearance