Specifications include, but are not limited to: 1) Architectural a. This work incudes selective JACOBS demolition of interior areas for: i. Existing Finance Area between col line 1A to 1B and A2 to A4 ii. Existing Food Lion Area between col line 0 to 1A and B to F 1. Interior walls and finishes 2. Interior floor finish of Hazardous Materials b. This work incudes selective JACOBS demolition of exterior areas for: i. Existing Dock area, Electrical and Fire Protection rooms between col Lines 3 to 5 on the North side of the Food Lion area c. This work includes selective GBA demolition of interior and exterior areas i. Refer the GBA drawings AD100, AD110, AD200, AD210 and H001 2) Structural a. This work includes selective JACOBS demolition of interior areas for: i. Existing Food Lion Area between column line D and F 1. Interior concrete floor slab and pit (retaining walls and foundation) 2. Interior CMU walls (coordinate with Architectural drawings) b. This work includes selective JACOBS demolition of exterior areas for: i. Existing dock area and asphalt slab north of Food Lion building column line F 1. Existing dock bump-out structure (roof, walls, and foundations) 2. Existing dock area CMU retaining walls