Specifications include, but are not limited to: A new HVAC system and components. Supplier shall: a) Install new Refrigerant lines b) Install all Thermostat controls and all control wires c) Install and perform all connections to new air handler d) Replace and connect all wiring and perform all electrical connections. Three phase wiring shall be utilized when necessary. e) Uninstall, remove old air handler, and dispose of off of Clemson University property f) Replace and install new ten (10) ton air handler unit. g) Remove all debris from the working area. h) Remove old compressor i) Install new compressor units that corresponds to new 10 ton air handler. j) Replace all condensate drain lines. k) Perform all electrical work connections l) Successful offeror will ensure new components match up and connect properly to existing components.