Specifications include, but are not limited to: Work for this project consists of abandoning the existing heating, ventilating, and air conditioning (HVAC) system in place and providing new variable refrigerant volume (VRV) systems with new dedicated outdoor air systems at the Darlington County School District (DCSD) Administration Building. Additionally, electrical scope includes a new back-up generator for the MDF and IT rooms in the IT Building, electrical upgrades to support the back-up system, electrical circuit tracing for both the Administration Building and IT Building, installation of structural support framing at a roof opening in the Administration Building, and installation of insulation in the attic space below the metal roof on the Administration Building.