Specifications include, but are not limited to: A. Demolish and remove existing well house building. B. Construct new well house building according to plans and specifications. C. Demolish, remove, and replace existing air compressors and air lines. D. Demolish, remove, and replace existing electrical components (control panel to match existing). E. Sandblast and repaint existing 10,000-gallon hydro-pneumatic tank (to match existing color). F. Dorchester County Water & Sewer will provide generator receptacle to be installed. G. Well will be taken off line while under construction. H. Existing chlorine system will be reused, with the exception of chlorine lines that will need to be reconnected to the new building.