Specifications include, but are not limited to:The work consists of cleaning and televising approximately 2,330 feet of8” sewer; performing 1 point repair to the existing main sewer (via excavation); replacing 1 service lateral to include a new ductile iron tee connection; installing 22 clean outs; lining approximately 2,330 feet of 8” sewer and 25 service laterals with cured-in-place pipe lining (CIPP); replacing 2 existing manholes with new precast manholes, rehabilitating approximately 55 vertical feet of manholes using cementitious mortar product, installing manhole frame and covers, and rebuilding bench and inverts;traffic control and pavement restoration; installing soil and erosion control devices; performing complete restoration as required; performing bypass pumping as necessary; and performing all other miscellaneous work required to complete the Project.