Specifications include, but are not limited to: o Remove & dispose of existing water cooled 100 ton chiller and cooling tower o Provide & install new Trane CGAM-100 air cooled chiller in area that the cooling tower is presently in o Chiller to have factory mounted circuit breaker, architectural louver, sound package, 5 year all parts and 1 year labor warranty o Replace chilled water pump with new Taco pump o Install new chilled water piping from existing boiler room to new chiller o Must include the following: o Underground work and coring o Heat tape and pipe insulation o All electrical and connection to existing controls o Enlarging or reconfiguring of equipment pad o Exposed outdoor piping to have metal jacket o All utility locating to be the responsibility of the successful contractor o Any damages to existing utilities to be repaired by successful contractor o Price includes all material, labor and equipment rental