Specifications include, but are not limited to: 1. The removal and disposal of the existing carpet squares and carpet in all areas of work. 2. The removal of all carpet mastic, attached to the concrete floor, that may interfere with the installation of the LVT flooring system 3. Compliance with the LVT manufacturer’s guideline for cleaning / preparation of the concrete floor, prior to applying the LVT Flooring Tile 4. Apply a leveling compound, if and where necessary, to the concrete floor where the finished concrete floor variance exceeds the manufacturer’s specifications. (Concrete floors shall be flat and smooth within 1/8" in 6 feet or 3/16” in 10 feet) Qualifying areas will be discussed with the owner, and approved by the owner before the contractor absorbs cost by remedying the concrete floor issue.