Specifications include, but are not limited to: Project management, traffic studies, environmental studies and documentation including public involvement, environmental permitting, bridge design, structural design, roadway design, hydrology/hydraulic design, geotechnical services, hazardous materials survey, subsurface utility engineering, utility coordination, right of way phase support, right of way coordination, right of way acquisition, development of preliminary/final right of way plans, value engineering, development of preliminary/final construction plans, pavement marking and signing plan, constructability review, construction phase services, engineer’s estimate/project specific special provisions and other related duties deemed necessary. SCDOT intends to select and negotiate a contract with one consultant team for development of these projects.