Specifications include, but are not limited to: 6.3.2.1 There shall be a minimum of two coats of paint or coatings and specified as outlined above. Application shall be performed by skilled workmen in accordance with manufacturer’s instructions. Material should not be applied when moisture and temperature levels are not within manufacturer’s instructions. 6.3.1.2 Verify all surfaces are ready to receive paints and coatings as instructed by the product manufacturer. Correct any defects, clean surfaces and remove or repair existing coatings that exhibit defects. 6.3.1.3 Apply products in accordance with manufacturer’s instructions. Apply each coat to uniform appearances. 6.3.1.4 Contractor should properly wash the concrete ceiling and painted wall areas using a bleach and de-greaser cleaning solution in order to remove algae, mold, exhaust fumes and silt run off from the upper structure. 6.3.1.5 Any flaking paint should be removed.