Specifications include, but are not limited to: All units to be replace are listed on the attached Mechanical plan. Details are listed below. All HVAC units to be replaced are on the 1st floor of the building. No work will be required in the Pharmacy (unit has already been replaced) All thermostats are to be replaced with new programmable units. No ductwork will be required other than what is required to install new units. All zones will remain the same. All units will be replaced with commercial units with equal or greater specifications than the units they are replacing. Bids will include all taxes, shipping, labor, and materials to fully complete installation, startup and testing. This will include gas hook up and electrical. Warranty on all units shall be at least 10 years. Installation should be to manufacturer’s standards, as to not void any part of the warranty. Ductwork attachments must be performed in a manner that minimizes air loss. Tape and at least 2 coats of Mastic will be required. Mastic must be fully dry before second coat is applied