Specifications include, but are not limited to: 1. Owner will secure all DOT permits necessary prior to construction. 2. Contractor will be responsible for contacting the locating service to identify location of utilities prior to construction. 3. Owner will be responsible for initial notification of properties owners impacted by sidewalk repairs. However, contractor must coordinate with Town staff and property owners to minimize disruption of access to property including driveway. 4. Once contractor has begun demolition, the Owner will supply materials, as available, to rope off the area. Demolition debris to be removed by the Contractor. 5. Contractor to provide, place, and fill sand where needed. Depending on the area, contractor may have to move the sand into forms by hand. 6. All drive way forms must be inspected by Town before pour. 7. All fill sand added will be machine compacted in place, if necessary. 8. Control joints will be placed every three to five feet to match existing sidewalk. 9. Concrete mix must conform to the standards of the adjoining sidewalks. 10. Contractor to form and pour the concrete, to include hand excavation to establish grade and the setting of forms. 11. Contractor, sub-contractor or suppliers are to avoid driving on lawn and grassy areas. All damage as a result must be fully repaired by contractor. 12. Concrete shall have a light broom finish. 13. Contractor shall provide round edges on sides. 14. Decretive brick shall be installed to match existing brick work, when necessary. 15. Contractor is responsible and shall provide security of wet concrete against vandalism and rainy conditions. 16. Contractor will be responsible for restoration along the edges of the new sidewalk once the forms are removed. 17. Contractor will be responsible for driveway packing and backfill, if impacted. 18. Contractor will be responsible for all traffic signage (pedestrian and vehicle), safety equipment, traffic cones and other items needed to inform the public of a construction site. 19. Owner will provide, as able, barricades to assist in pedestrian and traffic control. 20. Contractor and Public Works Supervisor will conduct site inspections to ensure project completion. 21. Additional specifications provided by SC DOT in Attachment A. Owner will supply DOT permit information which will be retained and utilized by Contractor.