Specifications include, but are not limited to:. This project includes construction of a new access road that connects from the existing Route Bravo access road near Taxiway C1 into Taxiway E3. The proposed route will run parallel to Taxiway C and is 18.5 feet wide and 2,000 feet long. The project includes the following approximate major project elements: 5,200 square yards of crushed aggregate base course, 5,000 square yards of existing pavement removal, storm drainage structures and pipe, and 1,500 cubic yards of excavation. In addition, the pavement section is being bid for both concrete and asphalt. The concrete section will include approximately 4,300 square yards of concrete pavement and the asphalt pavement section will include approximately 1,000 tons of asphalt. Associated work items include demolition, erosion control, topsoiling and grassing, and pavement marking