Specifications include, but are not limited to: Reroof the buildings with all new roofing material including, but not limited to: .50 mill Duro-last Duro-fleece roof system with 15 year warranty Remove old coping metal and install new coping metal, Install boot’s on all vent pipes Install .50 mil TPO Roofing System Install new HD Board Flash up and over walls with .50 mil TPO Remove and dispose of all debris. Existing gutters and downspouts will remain Include Material and Labor Warranty Buildings will be operational during the construction and adequate safety measures must be taken to ensure employee and public safety for continued operations of the facilities Remove and dispose of all debris