Specifications include, but are not limited to: The purpose of this solicitation is to establish a source or sources of supply for the purchase of (1) new Chiller as replacements at Broad River Correctional. • 90 Ton Daikin Air Cooled Chiller • TAG: Greenwood Dorm • Minimum Chiller Efficiency: EER: 10.96 and IPLV: 16.95 208v/3ph • Entering Water Temp: 54°F and Leaving Water Temp: 44°F • Chiller cannot exceed existing pad footprint of 88 [in] wide by 150 [in] Length. Stamped Structural Engineer drawing and concrete bill of material and labor costs must be included in price by vendor if chiller exceeds pad footprint. • Chill water lines must be able to enter the chiller on the left side in the middle of the unit when facing the electrical panels on chiller. • Painted exterior louvered hail guards factory mounted • Thermal dispersion flow switch and strainer – factory mounted • Vibration isolation • Shipping Weight: 4,500 lbs. • Required low ambient operation to (-10) °F • Single point power disconnect switch with circuit protection • 115v convenience outlet factory mounted • Factory service start-up • 1st year parts on entire unit warranty • Extended 4 year compressor parts warranty. Labor not included. • Standard 9 week lead time