Specifications include, but are not limited to: •Finish grade of staging pad shall match the rear stair landing pad of the transfer station. •Cement shall be 4000psi with fiber. •Footer to be installed around the entire pad. •Wire mesh shall be installed on entire pad. •1/2”Rebarinfooterasshown,(x2).•Vapor Barrier on entire pad. •Heavy Broom Finish. •Final grade shall be established by contractor to create positive drainage of the pad away from the building to the rear of the yard. •Owner shall view and approve all final grade shots prior to vapor barrier being installed (Mandatory). •Concrete shall be finished with rounded edges. (no sharp corners) •Concrete to have saw joints installed to industry standards within 24hrs.