Specifications include, but are not limited to: 1. Interested Contractors shall develop a team of professionals who are capable of offering the variety of services defined herein. 2. Activities assigned to the Contractor under this contract may include, yet not be limited to: a. All necessary preparations for Demolition of Residential and Non-Residential Structures and Land Reclamation of post-demolition properties in accordance with regulations and/or ordinances as enforced by the local government in which the property is located and in accordance with standards set forth by FEMA and HUD for the HMGP buyout program. b. Proper Demolition of Residential and Non-Residential Structures and disposal of materials resulting from the demolitions in accordance with all South Carolina DHEC regulations. c. Reclamation of land after demolition to a near natural state, to include properly removing any exposed utility (electric, gas, water, sewer, etc.) lines and properly disconnecting and making safe all underground and above ground utilities. d. All necessary pre-demolition and post-demolition erosion control and storm water control measures. 3. The contractor shall be responsible for obtaining all necessary permits as required by the local jurisdiction and costs associated with obtaining said permits shall be the responsibility of the contractor.