Specifications include, but are not limited to: Removal and proper disposal off-site of existing flooring material and cove base. Waste material shall be disposed of in accordance with local and state regulations. All disposal charges incurred will be the responsibility of the contractor. All waste material will be removed from the site daily. Delivery and installation of new carpet and vinyl wall base. Installation to be in accordance with manufacturers written installation instructions. Floor is to be prepared for proper installation. Installers must have experience in the installation of the identified product. Provide and install new transition stripes as required. All floor and wall measurements will be verified by Contractor. The contractor shall keep the construction site clean and free from an accumulation of debris or building materials during the removal and installation. The contractor shall remove from the premises all accumulations of trash and other materials, which are not to be used in construction, on a daily basis. All tools must be removed prior to opening each day.