Specifications include, but are not limited to: • Install and configure two (2) CF v2018 servers (non-clustered), patched to most current level-- one (1) production and one (1) dev/test • Complete the CF v2018 system lockdown per Adobe Best Practices on both instances and provide audit documentation, including CF installation details • Update the ColdFusion Website Connector as required • Perform step-thru migration of all existing CF v7 applications • Resolve all deprecated and deleted tag issues impacting CF v2018 compatibility • Resolve all CF v2018 template, CF query, and CF script compatibility issues • Resolve all code refactoring issues • Resolve any security issues which may impact application functionality following migration • Catalog and classify the exact code base being migrated • Catalog all application files, folders and settings • Perform application testing, error analysis, and post-upgrade stability tests • Identify and resolve any basic post-migration performance issues.