Specifications include, but are not limited to: This scope of work for this project includes all labor, materials, equipment, and related services (including but not limited to survey and layout) necessary to construct Segment 4A of the William C. O’Neill Bike Path. The route of the path as shown on the project drawings begins at the terminus of the existing William C. O’Neill Bike Path (Phase 3) at Mumford Road, crosses Mumford Road, and then follows the edge of the Narragansett Elementary School property to a point, and then turns to follow the edge of the practice soccer field to an ending point at the Narragansett Community Center parking lot. The total length of Segment 4A is approximately 1,750 linear feet. The finished paved width will be twelve (12) feet, and the project includes storm water and water quality measures as noted on the plans, as well as fencing (chain link) and ancillary landscaping. In general, the technical specifications follow RIDOT standards for bike path construction.