Specifications include, but are not limited to: The work in this Contract includes the installation of new edge line, skip line, gore area, arrow, word, stop line, yield line, crosswalk, and other pavement markings at the same locations of existing markings (hereafter referred to as "replacement" work) and the installation and removal of pavement markings at other locations to be determined by the Department after Contract award (hereafter referred to as "as needed" work), all in conformance with the latest Manual on Uniform Traffic Control Devices and its latest revisions. Also included in this Contract is temporary traffic control on all roadways in conjunction with the striping work, removal of all types of pavement markings, and other incidentals necessary to complete the work in accordance with Contract requirements.