Specifications include, but are not limited to: 1. Remove and dispose of twelve (12) existing floating docks and replace with twelve (12) new floating docks as shown on the attached drawings. All existing piles are to remain. Incorporate a utility chase below the dock for electric and water utilities. NOTE: All floating dock components shall remain in place until new floating dock components are delivered to site and ready for installation. Prior to dismantling existing floating docks, a minimum of 48-hour advanced notice to Owner is required. 2. Use galvanized inside and outside corner brackets with hinged connections for all dock-to-dock connections similar to those shown on the attached drawings. 3. Use rub rails and corner protectors around perimeter of finger docks only.