Specifications include, but are not limited to: 1. Layout and excavate the existing wood fiber for an area totaling the bid specified square footage to a depth of 12” as measured from the protective surfacing height identified on the equipment posts. Non decomposed wood fiber shall be spread around playground equipment not to be protected with rubber or stockpiled on the school property at a location identified during the pre-bid site visit. As needed decomposed wood fiber not suitable for use and subsoil shall be removed and transported by the contractor to Newport City Yard at 80 Halsey Street, a driving distance of one mile 2. Supply and Install 8 ½” dense grade crusher run within the specified square footage. 3. Provide and install 3 ½” poured in place rubber surfacing system. The product shall be Surface America PlayBound Poured-In-Place Rubber Surfacing System or an approved equivalent based on published specifications. The poured in place rubber surfacing system shall be installed in conformance with the published manufacturer installation specifications. 4. The top color shall be a 50% green, 50% black speckled mix. 5. The edges of the rubber shall be flush when adjacent to concrete curbing and beveled where it transitions to structural wood fiber.