Specifications include, but are not limited to: 1. Rotted wood on LVLs ( (4) four ply’s of 2 x 12) North and South Beams a. Remove approximately 48” of rotted wood to clean, dry wood from the (2) two outer 2x12 ply’s on each of the North and South LVL’s. b. Cut and insert new pressure treated 2 x 12 to fit in the areas that were removed c. Through bolt with (2) two bolts every 12 inches. Countersink bolts and nuts d. See Beam Detail for reference 2. Rotted wood on LVLs (4) four ply’s of 2 x 12) Front Facing Beams a. Remove rotted wood from the front facing LVL beams b. Cut and insert new pressure treated 2 x 12 pieces to fit in the areas that were removed. c. Through bolt with (2) two bolts every 12 inches where needed. Countersink bolts and nuts. d. See Beam Detail for reference e. Remove, cut or hammer in ALL old fasteners to create a new smooth surface. f. All demolition debris will be left in a designated area(s) for removal by the owner. 3. Rebuild Posts eliminating existing tapered detail. a. see Beam Extension/Base Detail