Specifications include, but are not limited to:Newport/Pell Bridge•Provide and install two power conduits, including conduit supports hung from existing bridge elements, with medium voltage (8kV) wiring the full length of the bridge as well as trenched concrete duct bank, conduits and medium voltage wiring within the approach fill sections.•Provide and install communication conduits and fiber optic cabling the length of the bridge, including to the roadway gantries, the towers and the anchorages.Mount Hope Bridge•Provide and install communication conduits, including conduit supports, with fiber optic cabling the length of the bridge, including to the roadway gantries, the towers and the anchorages as well as trenched duct banks.