Specifications include, but are not limited to: removal and abatement of asbestos roofing materials identified within the Appendix section of these specification and installation of a new .60 EPDM roof membrane on rigid protection board over rigid insulation attached to existing metal roof deck, mechanically fastened and provide a twenty five year warranty. This work will require the replacement of the existing built up wood nailer, new roof drain inserts and aluminum fascia. The existing metal deck along the perimeter is believed to have failed in many areas, the contractor shall include within their bid the cost to remove and replace 25% (1,250 Sq.Ft.) of the existing roof deck and to provide a unit price for any addition or deletion of this amount. The existing metal deck is 1-1/2” deep with ribs 4” o.