Specifications include, but are not limited to: 1.1 Remove existing 6” x 12” spool, two 6” Gate Valves, 6” Badger ModMAG M2000 meter, and 6” x 16” tee. Town to retain ownership of 6” x 12” spool. 1.2 Store and transport existing M2000 Meter to the West Bay Drive location (for installation at that location). 1.3 Transport new (Town owned) Badger Recordall Fire Series Assembly from the Town water division facility at 1 Old Point Judith Road to the project location. Add (furnish and install) new 2 inch testing connection including connection pipe, valve(s), fittings, etc. 1.4 Furnish and install new 6” spool. Reinstall one existing 6” Gate Valve, Install new 6” dia. Fire service meter assembly. New meter assembly to be provided by the Town. Provide proper support for new meter assembly. New 6” dia. spool to be furnished and installed shall be AWWA C-115 dlanged ductile iron pipe of necessary length to perform the work. Contractor to furnish and install all necessary appurtenances necessary to complete the work. 1.5 Install Electronic Reading Transmitters (ERT) inside meter pit on wall. Route and support ERT wires as necessary.