Specifications include, but are not limited to: General Site Work: Including all Site Demolition (other than existing playground/sports equipment) and Preparation, Earthwork and Grading to subgrade (including all berming, bioretention basin grading and equipment in place, and grading to subgrade for Playground Surfacing), new boulder placement, Landscape Bed Preparation (including mulching), and Loam and Seed. Removal/Disposal Existing Playground/Sports Equipment: Including removal and disposal of playground equipment, basketball poles/backboard/hoops, and volleyball poles. Walkways/Edging: Including all Pedestrian Bituminous Concrete Surfacing (including compacted base material), installation of conduits and noctilucent pavers, playground surfacing edging, paver surfacing and pea stone weed control at interface between pedestrian and vehicular bituminous concrete surfacing, and concrete pad surfacing at all bench locations and handicap access points to playground. Parking/Paving: Including all Vehicular Bituminous Concrete Surfacing (including compacted base material), and curbing.