Specifications include, but are not limited to: Chemical treatment with chlorine, muriatic acid, and metaphosphate, along with redevelopment of the gravel packed Well: Bradford II, which is a vertical turbine pump/well setup; Work to also include: 1. Determination of present well production capacity. 2. Equipment setup and tear down, removal and installation of submersible turbine pumping equipment. 3. Disassemble, reassemble, clean, inspect, explain and advise as to condition of the pumping equipment. 4. Repair of pumping equipment as needed and with approval of the owner. 5. Redevelopment and determination of well production capacity. 6. Supply chemicals and provide equipment necessary for the chemical treatment. 7. A report on the redevelopment to include but not limited a description of the process, initial results, treatment, and final results. 8. Video inspection of interior well casing after pump is removed for any defects.