Specifications include, but are not limited to: 1. Relocation/alignment of Pier Road • Relocation of the western section of Pier Road and associated utility infrastructure including water, gas, electric, sewer, and telecommunications services further west to accommodate campus building expansion and consolidation of parking. Electric and telecommunications infrastructure is recommended to be located underground to provide campus resiliency and reduce visual clutter. New entrance will include a security station and bus shelter. 2. Site/Utility • The Master Plan recommendations include improvements to campus infrastructure, lighting, way-finding, accessibility, circulation, and parking to support to the proposed building program, reduce impacts to the environment, and improve circulation and resiliency. The most significant infrastructure improvements proposed in support of the campus master plan include campus wide storm water improvements, the relocation of the western portion of Pier Road, and improvements to infrastructure. 3. Marine Operations Building • An approximately 12,250 gross square foot building containing storage, shops, offices, and other support spaces. Also includes dive program operations. 4. Ocean Innovation Center (Ocean Technology and Robotics) • An approximately 20,935 net square foot building including space for Robotics (4,000 sf of High Bay/Staging; 1,575 sf of Tank Area; 2,520 sf for (6) Primary Research Labs; and 840 sf for (4) Secondary Research Labs); 6,000 sf for Incubator; 2,000 sf for I-Core; and 4,000 sf for Engineering Design Lab.