Specifications include, but are not limited to: 1. Set up crane, cones and caution tape around area where the crane is located and approved by job supervisor. 2. Load roof with roofing supplies and safety equipment. 3. Furnish & install new pressure treated wood blocking to match new insulation height on perimeter of roof. 4. Furnish & install 1” insulation board mechanically fastened using treated plates and heavy duty fasteners, according to manufacturer's recommendations. 5. Furnish & install 0.060 mil TPO membrane (white, gray, or tan) mechanically attached using TPO plates and heavy duty fasteners, according to manufacturer’s recommendations. 6. Furnish & install two (2) new RAC drains at existing drain locations and properly flash and sump, according to manufacturer’s recommendations. 7. Properly flash all penetrations, according to manufacturer's recommendations. 8. Furnish & install 0.040 standard color edge metal, according to manufacturer's recommendations. 9. Bidder to secure building permit with the City/Town of Johnston, RI. 10.Properly dispose of all construction waste per RI state law. 11.All applicable OSHA safety standards will be enforced throughout the project. 12.Provide owner with a 20 Year total system warranty.