All correspondence must be made through the Vendor Portal. South Regional Water Treatment Plant (SRWTP) Expansion from 6 Million Gallons Per Day (MGD) to 8 MGD. The work shall be constructed in accordance with the plans and specifications. See 34-ITB-25 Attachment A - Final Design Technical Specifications and 34-ITB-25 Attachment B - Final Drawings. The work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the following: New Well No. 5: 1,750 GPM capacity. The well design and development will be by others. This project will include furnishing and installing the well pump, process mechanical discharge piping, and raw water yard piping to the plant, and all associated concrete and civil work. Reverse Osmosis Feed High Pressure Pump No. 5: A new 1,750 Gallons Per Minute (GPM) Reverse Osmosis (RO) feed pump to be furnished and installed, including all piping, valves, and connections to plant system. Degasification and Odor Control: Furnish and install a third degasifier unit and all associated work including air and reverse osmosis blended water piping and connections to existing system, including modifications to the CIP system to provide for cleaning functionality of the third degasifier. High Service Pumping: Remove one 1,111 GPM high service pump and associated discharge piping and replace with new 2,222 GPM high service pump and associated discharge piping.