Specifications include, but are not limited to:. The Phase 1 project is for roadway culvert replacements and includes three main canal culverts within the northwest quadrant of the Drainage Basin 15. The Phase 2 project is the addition of 48” reinforced concrete pipe (RCP) to supplemental the flow of an existing 42” canal culvert a secondary discharge bypass for the existing 42” RCP culvert. It also includes the addition of five manholes structures, cutting into and connecting to existing street drainage pipe and canal culvert pipes. The Work for this project consists of, but is not limited to, sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, canal bypass pumping, temporary steel sheet piling, dewatering, demolition and replacement of existing canal culvert pipe, street drainage pipe and structures, demolition and restoration of pavement, curb and sidewalk, shaping and excavation and grading of the existing canals banks, construction of concrete end walls, construction of filter point grout mat, relocation of existing water main pipe, replacement of existing PVC gravity sewer main piping with ductile iron pipe, cutting into and connecting to existing street drainage pipe and canal culvert pipes, pavement milling and resurfacing, pavement markings, sodding and other miscellaneous and incidental items to provide a complete project as specified in the Contract Documents.