This project includes but not limited to: site work, interior renovations, building addition, mechanical/electrical/plumbing, and associated utility connections as shown on the plans and specifications. ITEM UNIT OF MEASURE UNIT PRICE Concrete Removal Per SF ___________ Asphalt Removal Per SF ___________ Minor Excavation (Unclassified) Per < 50 CY ___________ Major Excavation (Unclassified) Per > 50 CY ___________ #57 stone, in-place Per Ton ___________ Compacted DGA in-place Per Ton ___________ 5” Standard Concrete Pavement Per SF ___________ Tactile Warning Pavers Per SF ___________ Asphalt Pavement (1.5” Surface) Per SF ___________ Asphalt Pavement (2” Base) Per SF ___________ 6” PVC Storm Pipe Per LF ___________ 4” PVC Storm Pipe Per LF ___________ Backfill & Compaction Per CY (Material from on-site) ___________ Backfill & Compaction Per CY (Material from off-site) ___________ Topsoil (on-site) Per CY ___________ Topsoil (off-site) Per CY ___________ Straw & Seeding Per SY ___________ Seeding & Straw Mat Per SY ___________ Silt Fence Per LF ___________ Finish Grading Per SY ___________