Specifications include, but are not limited to: A. The work included in this contract includes all services, labor, equipment, supplies, and materials required to construct the proposed improvements, including the contract previously executed for pipe supply, and sales tax. B. The Cottonwoods Connection Project (Project) is a project to construct new pipelines that, when interconnected, will provide a resilient regional water supply and add additional capacity and flexibility to exchange water supplies between MWDSLS and Salt Lake City Corporation both in the near and long term. The Project is comprised of three separate pipeline schedules that are interconnected to convey raw or finished water north or south. Contractors may bid on any one (1) or all three (3) schedules: 1. Schedule A, Cottonwoods Connector – Schedule 1 (CC-1) Work; includes construction of 36-inch welded steel pipe (WSP), outlets for future connections, air valve and blow off structures, cathodic protection facilities, and associated appurtenances. Note that this section includes heavy-wall pipe with full penetration butt welds to mitigate fault crossings and slope stability issues. This schedule is bid in two distinct packages: a. Schedule A, Package A-1; includes construction crossing Wasatch Boulevard and east to the Big Cottonwood Water Treatment Plant. This schedule has specific coordination efforts due to UDOT rehabilitation activities as described in Section 01 31 13. b. Schedule A, Package A-2; includes construction in Fort Union Boulevard. 2. Schedule B, Cottonwoods Connector – Schedule 2 (CC-2) Work; includes construction of 36-inch WSP (base bid) or HDPE pipe (bid alternate), site improvements, and asphalt replacement. a. Little Cottonwood Water Treatment Plant (LCWTP) improvements: pavement replacement, curb and gutter, drainage improvements, vehicle gate replacements, pedestrian gate installation, and entrance sign site improvements. 3. Schedule C, Salt Lake Aqueduct Replacement (SLAR) Work; includes construction of 60-, 66-, and 72-inch WSP for the SLAR, outlets for future connections, turnout vaults, air valve and blow of structures, cathodic protection facilities, and associated appurtenances. Schedule C Work also includes installation of 69-inch WSP to relocate a portion of the Salt Lake Aqueduct (SLA) and installation of 36- inch WSP to relocate a portion of the Little Cottonwood Conduit (LCC). This schedule is bid in three distinct packages: a. Schedule C, Package C-1 SLAR including: 1) SLAR/CC-2 bifurcation and meter vault and site improvements. 2) SLAR/CC-1 bifurcation and valve vault and site improvements. 3) Grading and drainage improvements north of the 10 Million Gallon (MG) Reservoir...