Specifications include, but are not limited to: 1. Traffic control. 2. Demo and disposal of existing pavers and sand. 3. Supply and installation of geotextile. 4. Supply and installation of bedding sand. 5. Installation of new pavers. 6. Supply and installation of polymeric sand between paver joints. CONSTRUCTION NOTES: 1. REPLACE EXISTING UNIT PAVERS 2. REPLACE BEDDING SAND - 1/2" TO 3/4 " THICK 3. POLYMETRIC SAND SWEPT JOINT TYP. - SEE SPECS 4. COMPACTED SUBGRADE 5. EXISTING CONCRETE FLATWORK, 4" TO 6" THICK 6. EXISTING ASPHALT PAVING 7. EXISTING CONCRETE CURB-WALL AT INTERFACE BETWEEN ASPHALT PAVING AND UNIT PAVERS 8. REPLACE GEOTEXTILE FABRIC - GEOTEX 451 OR EQUIVALENT 9. EXISTING 1" DRAINAGE WEEP HOLES AT 18"x18" GRID