Specifications include, but are not limited to: • Review as-builts and provide recommendations for the alignment of the 20-inch water transmission main and the new parallel water distribution main. • Develop construction documents for 4,000 linear feet of transmission main along 9th Avenue between Roosevelt and Washington Streets and 1,650 feet of water distribution main along 9th Avenue between Roosevelt and Taylor Streets. • Develop construction documents for 1,600 linear feet of water transmission main along 44th Street between Van Buren Street and McKinley Street. • Develop construction documents for other areas requiring replacement of cast iron transmission mains as identified in the design phase. • Conduct geotechnical evaluation as necessary to develop construction requirements. • Provide survey services as required to support the field investigation and design at each location. • Identify all utility locations both vertically and horizontally along the pipeline routes. Coordinate with the City’s potholing contractor as necessary to establish utility locations. • Prepare opinion of probable cost for construction. • Obtain all applicable permits. • Assist with the development of detailed shutdown plans (MOPOs). • Provide data reflecting changes to the asset registry in the City’s computer maintenance management system (CMMS) and GIS. • Assist with development of scope documents for Job Order Contract support agreements.