Specifications include, but are not limited to: The demolition and renovation scope will be approximately 6,300 GSF of the existing space in the Bass Center Tower II Level 9 for the Research Grants & Contracts department. This space will require the demo and removal including but not limited, walls, ceilings, ductwork, plumbing piping, lights, doors, door frames, shelving, cabinetry, fire sprinklers, fire alarm devices, HVAC equipment, electrical equipment, electrical receptacles, lighting, switches, smoke detectors, security devices and equipment, electrical panels, J-boxes, electrical conduit, all wiring, all switches, and telephone as shown on the drawings. The space will require new construction of walls, ceilings, MEP systems, flooring, millwork, ceilings, painting, testing, fireproofing, coordination of equipment requirements with vendors, new accessories, fire alarm, controls, as shown on the drawings. This project will also include the fireproofing of the exterior window walls at the floor to floor separations.