Specifications include, but are not limited to: The contractor shall furnish and deliver HVAC maintenance and repair for various facilities at Ford Park. The facilities included in this contract are as follows: - Central Plant - Arena - Pavilion - Exhibit Hall - Ball Fields inspection. Equipment Annual Inspection Quarterly Inspection Cooling towers • Check condition of fill materials • Grease bearings • Replace belt and sent tension • Cycle control valves • Grease bearings • Verify operation Chillers • Inspect all electrical connections • Brush condenser tubes • Clean coils (using water only) • Leaks test • Oil test • Performance test • Test motors • Clean coil (using water only) • Check charge • Verify proper operation Split units • Clean coils • Check refrigerant charge • Inspect all electrical connections • Performance test • Test motors • Clean coil (using water only) • Check charge • Verify proper operation Air handler units • Clean coils • Adjust or replace belts as needed • Clean drain pan & drain, add slim tab • Inspect duct • Verify control valve operations • Check belts • Clean drains, add slim tab Boilers • Brush tubes • Check & balance gas and air mix • Performance test based on flue gas • Verify proper operation Pumps • Lubricate and verify operation • Check pressure drop • Test motors • Lubricate and verify operation