Specifications include, but are not limited to: SPECIFICATIONS: Bidder is encouraged to make on-site inspection to access scope of work to be done. 1. New carpet in office areas approximately 1600 square feet - commercial carpet squares - Flor Early Adopter or equivalent. 2. New vinyl commercial floor moulding to match carpet 3. Vinyl tile in hallway approximately 200 square feet - clean up existing or replace 4. Remove hallway wall studs and windows except for approximately 9 feet of wall behind HVAC blower unit. Add additional structure to remaining wall to achieve a 42�h high wall. Reattach existing slate window counter. 5. Shore up hallway overhead soffit as needed. 6. Construct typical stud/drywall wall 81" high by 10 feet long in reception area 7. Construct typical stud/drywall wall 96" high by 17 feet long in copier area. Brace to structure above. Power should be run through bracing structure. 8. Construct typical stud/drywall wall 96" high by 10.-10�h feet long in Director's office. Brace to structure above. Power should be run through bracing structure. 9. Remove walls and glass in Planner area 10.Rework suspended ceiling grid as needed and construct new suspended ceiling in vault area. 11.Kitchen style cabinets/cupboards in copier area with 42" high counter tops. Cabinets must be quality grade cabinets - not economy. Quality stain/clear finish. Color to be determined. 12.42" high cabinet in hallway/reception area. Cabinet must be quality grade cabinet - not economy. Quality stain/clear finish. Color to be determined. 13.Rework chase/fire extinguisher cabinet in hallway area. Reduce size to minimum required. 14.Remove concrete block wall and door on east side (Wall A on plans). All concrete blocks are to be removed except for approximately 36�h portion of block wall with roof drain chase. Construct 32�h stud/drywall soffit. Relocate HVAC blower unit condensation drain through new soffit and drop through floor to chase below. 15.Remove north and west vault concrete block walls and door (Wall B & C as shown in plans). East wall must remain to accommodate roof drain. 16.Rework electric outlets / computer network ports / telephone jacks as needed. 2 new drop in fluorescent fixtures. 17.Painting and wall covering as needed 18.Time Frame - Forty Five days for demolition, construction, clean-up, and completion 19.Field Inspection - An on-site inspection of the space is required to assess any difficulties with deliveries or removal of demolition 20.Phased construction may be required