Specifications include, but are not limited to: Contractor is to remove & dispose of the existing metal roofing systemas it is hitherto explained. Contractor is to investigate the salvagepotential of the existing metal roofing panels. All panels that areremoved in a manner that the panels maybe reused, then those panelsare to be salvaged, set aside and palletized for the agency's future use.Any metal panels that are damaged or not reusable, the contractor isresponsible for the disposal of said panel. Contractor is to install thespecified curbs for the HVAC units as shown on the plans. Contractor isto install the specified insulation and cover boards mechanicallyfastened. Contractor is to install a fully adhered 60 mil nonreinforcedEPDM roofing system as specified. Contractor to provide thewarranties as outlined in the specifications. CACHE VALLEY HUNTERS EDUCATIONBUILDING RE-ROOF