Specifications include, but are not limited to: STPP 19-1(61)0 - Seal and cover, pavement markings, bridge deck repair, guardrail, and safety improvements on the JCT I-90 to Anaconda (MT-1) project located in Deer Lodge County. The project is located along Primary Route 19 (MT-1) from the I-90 Anaconda Interchange at RP 0.0 and extends northwesterly for approximately 6.9 miles to just east of N Polk Street in Anaconda at RP 7.1.; STPP 46-8(4)76 - Seal & cover, guardrail, and pavement markings on the Divide-East & West project located within Silver Bow County. The project begins 0.5 miles west of Divide at RP 76.5 and proceeds east approximately 1.2 miles along State Primary Route 46/MT 43 to RP 77.7 near the southbound ramps of the I-15 Divide Interchange.; EMULSIFIED ASPHALT CHFRS-2P, QTY 621.300 TON; FINAL SWEEP AND BROOM, QTY 15.300 CRMI; COVER-TYPE 1, QTY 349,642.000 SQYD; BRIDGE DECK CRACK SEAL, QTY 1,840.000 SQYD; CLASS A BRIDGE DECK REPAIR, QTY 40.000 SQYD; CLASS B BRIDGE DECK REPAIR, QTY 5.000 SQYD; REVISE CONCRETE BARRIER RAIL-BR, QTY 868.000 LNFT; REVISE CONC BARRIER RAIL END-BR, QTY 4.000 EACH; REMOVE CONCRETE BARRIER RAIL, QTY 4.000 EACH; GUARDRAIL END SECTION WIDENING, QTY 16.000 EACH; GUARDRAIL-STL/BR APPR-TY 1, QTY 2.000 EACH; MGS GUARDRAIL, QTY 8,373.200 LNFT; MASH W-BEAM TERMINAL SECTION, QTY 16.000 EACH; MGS LONGSPAN GUARDRAIL, QTY 100.000 LNFT; MASH THRIE BEAM BR APPRCH SECTION, QTY 18.000 EACH; MGS ONE-WAY DEPARTURE TERMINAL SECTION, QTY 12.000 EACH; REMOVE GUARDRAIL, QTY 9,785.800 LNFT; RESET TEMP IMPACT ATTENUATOR, QTY 4.000 EACH; TEMPORARY IMPACT ATTENUATOR, QTY 4.000 EACH; CURB 4 IN-CONCRETE, QTY 200.000 LNFT