Specifications include, but are not limited to: 1. Installation of irrigation pump with wet-well, intake line, and intake structure. 2. Installation of concrete pads at pump station. 3. Installation of connections from City on-site power source to pump station. 4. Field verification of domestic water connection to existing irrigation system. 5. Disconnect existing irrigation lines from domestic water lines and capping of existing domestic water lines. 6. Installation of 6” irrigation main line and 2” irrigation line. 7. Horizontal Boring of irrigation lines. 8. Remove asphalt and pavement at selected locations and restore with 15" base course (SDDOT Standards). 9. Restore any damage to trails, streets, parking lots, with gravel base. 10. Site clean up