Specifications include, but are not limited to: The following applies to spaces specified for complete sanding and refinishing. Reference the Proposal Form for additional information. ‐ The entire court shall be sanded, all dead spots reasonably identified repaired, and all other damaged areas visually observed, repaired. ‐ The basis of design is based on products manufactured by Hillyard, Inc. Products manufactured by Bona will be considered pending compliance with the specifications. No other manufacturers will be considered. ‐ The products and techniques to be used for a refinish shall be Hillyard Basecoat and 350 Gym Finish System, Four (4) Coat System; ‐ 1st Coat ‐ Basecoat #HIL0028633 ‐ 2nd Coat ‐ Basecoat #HIL0028633 ‐ Paint lines, letter, and areas with gym line marking paints ‐ 3rd Coat ‐ Basecoat #HIL0028633 ‐ 4th Coat ‐ #350 Gym finish for wood floors ‐ Contractors must certify that they have been factory trained, authorized, and experienced in repairing & refinishing wood gym flooring. ‐ All existing lines, logos, markings, etc. shall be repainted as is. The Holland Middle School gym floor layout will be modified as a part of this project scope (see sketch). Confirm with Owner prior to commencing with the work. ‐ Costs associated with any potential changes to any building will be addressed with the material allowance listed on the bid form. The Material Allowances listed on the bid form are to be included in the base bid proposal. Any unused Material Allowance will be returned to the Owner at the conclusion of the project via a credit change order. ‐ All painting, letters, works, lines and staining shall be approved prior to the final finish. ‐ Contractor must include in price cost to repair existing damage and keep further cracking / splitting of ends as part of the proposal. ‐ All painting, letters, works, lines and staining shall be approved prior to the final finish.