Specifications include, but are not limited to: Mobilization and Demobilization, including Erosion and Sediment Control Measures. INFLUENT SCREENING, COMPLETE Includes Construction of New Influent Screening Chamber, New Band Screen, Fabricated Gate, and Associated Site Work. EQUALIZATION TANKS, COMPLETE Includes Cleaning and Pressure Washing of Tanks. Also Includes: Replacement of Diffusers and Aeration Piping, Modification of Blower Layout, Replacement of Blowers, Blower Controls, Construction of New Effluent Flow Control Chamber, and Valve Installation. OXIDATION DITCHES, COMPLETE Includes Draining, Cleaning, and Pressure Washing of Ditches, Replacement of Oxidation Ditch Rotors, Controls, Final Clarifier Mechanisms, and Modifications to Oxidation Ditch Splitter Box.