Specifications include, but are not limited to: Walnut Street from 2nd Street to 3rd Street and from the southern school driveway (Alburtis Elementary School) to South Oak Street/South School Street. 5. The Contractor must furnish a construction schedule noting the timing for installation of key elements. The Contractor must coordinate their schedule with Sharon Trexler, Borough Manager, who will discuss with Donnie Derr, Director of Public Works, and Jeffrey Ott, P.E., Borough Engineer. 6. The roadways must remain open. Access to the homes along the roads in the work areas should be provided for local residents, school buses, emergency vehicles, etc. However, temporary closures are allowable but must be coordinated with the Alburtis Police Department, Sharon Trexler, Donnie Derr and local emergency agencies. 7. The serial number for the latest Prevailing Wage Rates, dated November 16, 2017, was uploaded onto PennBid. You can acquire the wage rates by visiting the PA Labor & Industry website. 8. The Contractor must post and notify the local residents 48 hours ahead of the work. 9. There will be some field adjustments. Actual quantities installed will be adjusted depending upon the site conditions. The limits of work should be coordinated with the Construction Observer on site