Specifications include, but are not limited to: The project scope of work consists of the replacement of an existing single span steel beam floor decking on steel I-beams supported by concrete abutments with a Single Span Composite Rolled Steel Beam Bridge utilizing PA Type 10M Bridge Barriers over the South Branch of Equinunk Creek. The existing roadway profile will be increased immediately next to the structure to accommodate the new structure while maintaining the low chord elevations. Other work includes excavation, full depth bituminous pavement bridge approach work, drainage, guide rail, landscaping, E & S Control measures, temporary traffic control using a temporary traffic signal, pavement markings, signs, steel bridge removal, temporary excavation & support and other miscellaneous work as indicated on the drawings of the approved bid package.