Specifications include, but are not limited to: The work currently being bid is Part 1 and includes construction of the following features: 1. Driveway entrance off of Valley Park Road (SR 1036), Sta. 0+00 to 0+46.74. Refer to PennDOT Highway Occupancy Permit Plans. 2. Driveway from Sta. 0+46.74 to 1+72.25. 3. North parking lot (adjacent to former Trolley Station) from Sta. 0+00 to 1+48.78. 4. North Trail. 5. North Trail Turnaround. 6. Anderson Cemetery Connection Trail, Sta. 0+00 to 1+00. 7. Removal and replacement of approximately 20 linear feet of existing walking trail at west end of North Trail. 8. Underground Stormwater Infiltration/Detention Bed DA-3.1, including connected storm sewer piping, inlets, manholes, endwalls, and rock outlet protection. 9. Infiltration Berm/Retentive Grading DA-1.2. 10. Maintenance driveway near DA-1.2.