Specifications include, but are not limited to: provide all construction materials, crane, overhead wire inside/outside the building, tools, equipment and services required to furnish, deliver and unload the Underfloor Wheel Lathe, and remove the existing machine. The Contractor shall provide handrails and pit covers for safety, and shall modify the existing foundation / pit as needed to accommodate the new machine. The Contractor shall install, commission, inspect and test the new Underfloor Wheel Lathe. The machine is to be operated from a control panel, which enables the operator access to all machine functions. The system shall be able to provide wheel profiling specific to tape size, concentricity and plane dimensions. The machine shall be CNC controlled, and designed to measure and machine a wheel set together. All openings in the floor shall have protection provided to ensure OSHA compliance regarding fall protection.