Specifications include, but are not limited to: Remove and Replace 8” DIP with 8” C900 per construction drawings, approximately 28’ b. Remove and Replace 12” DIP with 12” C900 per construction drawings, approximately 4’ c. Remove and Replace 6” DIP with 6” C900 per construction drawings, , approximately 4’ d. Remove and Replace All 8 Pipe Pedestals per construction drawings e. Salvage (1) 8” gate valve, replace packing and reinstall, Scrape and Paint f. Remove and Replace 8” Flow control Valve g. Remove and Replace (2) 8” 90 Degree Fittings h. Remove and Replace (1) 8” Check Valve i. Remove and Replace (1) 8” Gate Valve j. Remove and Replace (1) 8” Tee k. Remove and Replace (1) 8” Flow Control Valve l. Remove and Replace (1) 8”x6” Reducer m. Remove and Replace Meter and Transmitter n. Remove and Replace (1) 6” Gate Valve o. Remove and Replace (1) 12”x6” Reducer p. Remove and Replace (1) 12”x8” Tee